Complicated demolition in Bremen: unexpected problems and new plans!

Complicated demolition in Bremen: unexpected problems and new plans!

Bremen, Deutschland - The demolition of the former Esprit department store in Bremen has been demolishing unexpected challenges. Currently only the rear wall remains, which is considered a front wall for the Lloydpassage. According to Gregor Mielke, the person responsible for the demolition, access to the work takes place exclusively from behind. To safely cancel the wall, use a special pliers.

The security of passers -by is a top priority in this project. Therefore, large demolition mats, foil cladding and barriers were installed. Mielke was optimistic that the back wall can be demolished on Tuesday evening. The demolition work is on schedule, and the final remaining work and the showing disposal are planned for Wednesday.

unexpected problems with demolition

Despite the planned process, unexpected difficulties occur. In some cases, the outer walls of the neighboring buildings were not built and use the wall of the demolished department store. It is possible that the standing walls must be preserved for the neighboring buildings for static reasons. Mielke proposed not to tear off the remaining walls and to make the planning of the new building smaller.

The planned new construction project is realized by the Berlin HD group as an investor and includes, among other things, a Rossmann branch on the ground floor. This is already confirmed, while it remains unclear whether a nearby branch will close. In the upper six floors, the SV Group is planning to build Stay Kooook, which will offer a total of 136 apartments for short and longer stays.

New concept with Stay Kooook

Stay Kooook will move into the Bremen living landscape with a modern and innovative approach. The concept not only offers accommodations, but also a community kitchen that promotes interaction between the guests. This is part of a comprehensive approach that the SV hotel group has successfully implemented in its first service apartment house in Leipzig. There is an in -house gastronomy concept called Koko, which was developed by the SV Hotel Group.

in Leipzig, Koko not only offers culinary offers, but also a coworking area and an event area that can be used for both internal and external events. The bar functions as a popular meeting place for locals and guests in the long and short stay area. The SV Hotel Group has set itself the goal of creating an appealing, urban concept that combines hotel -like service with the advantages of hostels and service apartments.

This day, the demolition story, which is as old as the building history itself, has developed. Technological advances make it possible to carry out off -road projects more efficiently and more safely. Processes such as controlled demolition of machines and robot techniques have revolutionized the methodological approaches. The challenges in modern demolition projects include both temporal and environmental -related requirements that are becoming increasingly important.

In this context, the SV Hotel Group emphasizes that the concept of Stay Kooook, which includes a personal hosting approach, aims to make the stay as pleasant as possible for the guests. The planning, booking and checking in can be conveniently managed via an app, which meets the modern user.

Overall, the project in Bremen shows that demolition work and the subsequent new construction planning are closely linked. Despite the challenges that show up during the demolition, the motto remains to find innovative solutions and to use the needs of future users.

For further details on the demolition work in Bremen, please visit Weser Kurier Tophotel , and for deeper insights into modern demolition methods visit Aberrissen .

Details
OrtBremen, Deutschland
Quellen

Kommentare (0)