Construction site chaos in Freital: Dresdner Straße will be renovated from July 7th!

Construction site chaos in Freital: Dresdner Straße will be renovated from July 7th!

From July 7th, there will be extensive asphalt rehabilitation work in Freital, more precisely on Dresdner Straße between Poisentalstrasse and Schachtstraße. As the city administration announced in its last communication, traffic in this area is severely impaired. The construction site affects two construction phases, such as Sächsische explained.

The first construction phase provides for a half -side block from Poisentalstrasse to Schachtstrasse. A lane towards Dresden remains accessible. Depirtions for traffic towards Tharandt and Possendorf are set up via the Schachtstraße and Hüttenstraße. Residents must prepare for the fact that the access roads to the Neumarkt are closed during this work. In order to ensure the accessibility of the resident shops such as Rewe, DM and the Nietzold nursery, access via the Aral petrol station and the parallel road behind the Rewe building is planned.

further course of the work

The second construction phase is expected to start on August 11th. In this phase, the section is processed from the height of the police to the Schachtstraße, including the intersection area. Here a lane remains accessible in both directions, but the entrances and exits to the shaft road must be blocked. The detour continues to take place via Hüttenstraße. The total cost of this project amounts to around 515,000 euros, which the city administration is planning well to get the street infrastructure back into shape.

The completion of the construction work is planned for September 5, 2025. Interestingly, the coverage renewal of Dresdner Straße has been carried out in sections since 2019. The last renovation in the affected area took place in the 1990s, which underlines the urgency of this measure. The current lane ceiling has numerous damage: it is worn out, open and shows trace formation and crack formation.

damage recording and coordination

Near the construction site there are additional damage to the gutter and on the bus bay on the Neumarkt, which is also newly paved. It is not only a step to improve the street scene, but also to an increase in traffic safety. The State Office for Road Construction and Transport ensures that all necessary measures are coordinated and implemented in time.

A look at the entire transport infrastructure in Saxony shows that there are around 10,000 structures along the federal highways, state and district streets that are regularly checked and serviced. The tasks also include the renewal of on-board systems and the examination of bridges, as can be seen on the website of the Saxon State Office for Road Construction. This ensures that the streets remain safe and functional for all road users.

For the residents and road users, asked for understanding for the restrictions during this work. It is important to keep a good knack during the diversions and to always make a careful driving style.

Details
OrtDresdner Straße, 01705 Freital, Deutschland
Quellen

Kommentare (0)