Construction site chaos in Aalen: What you need to know now!

Construction site chaos in Aalen: What you need to know now!
Aalen, Deutschland - In Aalen, the city administration has published the current construction site plan for June 2025, which includes various important construction projects and the associated traffic disabilities. According to Schwäbische Post affected. The construction of a new commercial building in the area of the eastern city grave leads to disabilities, while the foot and bike path on Stuttgarter Straße and Friedrichstrasse is closed due to recovery work on the Gaulbad. However, access to the town hall deep car park remains possible.
In addition, there are private construction work on the corner of Rittergasse/at the city church that cause temporary disabilities and the establishment of buildings. Also in Friedrichstrasse there will be a closure of the sidewalk on the outdoor side from Eichwaldstraße until mid -July 2025.
construction sites in the entire urban area
Another important point are the construction work at the Walkstrasse level crossing, where there can be occasional traffic disruptions due to construction machinery. This overall project is expected to be completed at the end of 2028. On Wellandstrasse, the walkway is closed at the level of house number 63, with a detour for walking by the end of 2025. The sewer construction work on Ziegelstraße and the street "Im Blümert" means that the street "im Blümert" between Ziegelstraße and house number 10 is fully blocked. Residents can approach a detour, while the sidewalk remains usable. This work is scheduled until mid -July 2025.
In the Wasseralfingen district, Hofwiesenstrasse is closed to through traffic between the Talschule and the sports hall on Schäle on weekdays. Here, foot traffic should be redirected, while cyclists have to switch to dirt roads. In Hofen there is a full closure of the village street and the Eichholzweg due to the development of the construction area and renovation work. However, access for residents remains guaranteed and is supported by signposted diversions. This work is planned by October 2025.
Current traffic information and potential dangers
Another area that requires attention is Fachsenfelder Strasse in Dewangen. This is fully blocked at the level of the cemetery from June 10th. The OVA lines 28 and 29 cannot drive on their stops during this block, and the “Hammerstadt junction Dewangen” stop is laid. This construction work is planned by June 20, 2025. Further possible traffic disruptions result from the expansion of the fiber optic network of TNG Stadtnetze GmbH in the urban area.
according to traffic situation.de There are currently no reports on specific danger types on the construction sites. Nevertheless, drivers are asked to be attentive, since unplanned obstacles, such as construction site material or unforeseen bottlenecks, can often endanger traffic safety. In addition to traffic jams and poor visibility, mobile and solid speed cameras must also be observed in this context.
For a detailed overview, interested citizens can view the current construction site plan at aalen.de/beautzenplan.
Details | |
---|---|
Ort | Aalen, Deutschland |
Quellen |