S-Bahn chaos: Change for airport travelers from Rems-Murr!

Current S-Bahn restrictions in the Rems-Murr district and around the airport: construction work require transitions and replacement traffic.
Current S-Bahn restrictions in the Rems-Murr district and around the airport: construction work require transitions and replacement traffic. (Symbolbild/NAG)

S-Bahn chaos: Change for airport travelers from Rems-Murr!

Vaihingen, Deutschland - Current restrictions in S-Bahn and Stadtbahn traffic currently determine mobility in the Rems-Murr district and beyond. Travelers who are looking for a connection to the airport have to prepare for inconvenience, as many S-Bahnen will not drive directly to the airport in the near future. According to ZVW MUST PATIONALLY in Vaihingen or at a previous stop transfer. The reason for the changes lies in ongoing construction work.

from Stuttgart-Hauptbahnhof, a shuttle traffic with regional trains to Vaihingen is set up, from where the travelers can switch to the S2. The transition to a replacement bus or the light rail could also be necessary, which extends the travel time and requires additional bypasses.

Details on the construction work

The railway conducts the work in a period from June 7 to June 15, 2025, which affects numerous lines in the light rail network. For example, the line U7 at the Suttnerstraße stop and the section from there to Mönchfeld is no longer necessary, as the vvs . Buses of the U7E line temporarily take over between Himmelleiter and Mönchfeld.

The U7 light rail line, however, remains functional between Ostfildern Nellingen and Suttnerstrasse. Avoiding options are available during the 10-minute cycle times, and the trains run out of Suttnerstrasse up to six minutes before the regular departure times.

further disorders in Berlin

In the capital Berlin, it is also built in many places, which can lead to different impairments in the S-Bahn network. Information on specific construction work and their schedules, as from s-railway berlin , show that from various sections of the route in the nights 11./12. and 12./13. June replacements with buses between selected stops take place. This includes important connections to the airport and other central points.

The current work in both regions is ultimately intended to improve the infrastructure and are therefore inevitable. Travelers are encouraged to inform themselves about their connections in advance and to plan enough time for possible surroundings. The persistent situation once again shows how important it is to check the timetables regularly.

Details
OrtVaihingen, Deutschland
Quellen