Construction site chaos: You have to avoid these streets in Dahme-Spreewald!
Construction site chaos: You have to avoid these streets in Dahme-Spreewald!
In the districts of Dahme-Spreewald and Teltow-Fläming, a lot is happening on the streets. The summer months bring a number of construction sites with it that drivers and commuters pose challenges. The A13 between Freiwalde and Lübbenau is particularly affected, where the base layer will be renovated until September 5. In both directions, traffic jams must be expected. As maz-online.de which literally scream for attention.
The full closure of the L401 in Eichwalde, which has existed since October and will continue until September 30, 2025. Detours via Godbersenstrasse are essential here. The L402 is also being worked on in Zeuthen: the construction of a central island ensures mutual traffic via a makeshift road until July 31. And if you are traveling in Mittenwalde, you should adjust to a mutual traffic routing on the L40, where the Telekom network infrastructure is expanding, and this lasts until August 10th.
Current construction sites and diversion instructions
In Groß Köris, the L742 is used to build the L742 until July 25, which results in stops and laid bus stops. It will also be uncomfortable on the L40 in Großbeeren until September 5: there is a full closure between Diedersdorf and Blankenfelde-Mahlow, whereby a detour via Birkholz and Mahlow is set up.
A look at the L793 in Ludwigsfelde shows that the full closure is not without the end of the year for the development of the industrial park. Remaining work on the B246 in Zossen is up to July 25th, while the B96 between Neuhof and Baruth will be fully blocked from July 28 to September 8th due to ceiling renovation work. The situation is similar in the B102 in Dahme/Mark: Here the road remains blocked by August 15th from the "Breite Wiesenweg" junction due to a fundamental expansion.
traffic information at a glance
With so many construction sites, you have often lost an overview. However, the ADAC offers helpful services to keep an eye on traffic in this chaotic time. The real-time traffic flow and short-term disorders can be viewed on the ADAC Maps. During route planning for a later point in time, even a traffic forecast is provided for the chosen departure time. Information about traffic on motorways and federal roads as well as in cities is also available.
In addition to planning, the extended traffic analyzes of the ADAC that are based on comprehensive data and enable route optimization. In this way, you remain prepared for construction sites in connection with development and traffic tours. If you want to stay up to date, you will always find current information on the website.
The multitude of restrictions makes it clear that there are still a lot of road construction work. It is to be hoped that all construction sites can be completed quickly and without further delays, so that the transport infrastructure works smoothly again.
Details | |
---|---|
Ort | Dahme-Spreewald, Deutschland |
Quellen |
Kommentare (0)