Construction work in Hamburg: Commuters will face massive traffic problems from Monday!

Construction work in Hamburg: Commuters will face massive traffic problems from Monday!
From Monday, June 1, 2025, extensive construction work begins in Hamburg, which will significantly impair rush hour traffic. In particular, the A25 in the direction of Geesthacht is affected by these measures, since only one lane is available from 6 a.m. These renovation work should continue until the end of November, which could be a significant challenge for commuters. The daily newspaper t-online.de reported that also on the A1 between Dibbersen and Seevetal-Hittfeld Traffic situation are tightened. There are only two lanes available here in both directions.
The Köhlbrandbrücke in the direction of Waltershof has only been driven on since Sunday. In addition, a complete blocking for the period from Friday, June 13th, is planned to Sunday evening. The urban construction work in Eidelstedt on Elbgaustraße, which has only been accessible south since last week, are also worth mentioning. Drivers who want to drive north must take a detour via the Farnhornweg and the Schnackenburgallee. This construction work on the 1.8 kilometer route is expected to take two years.
traffic restrictions in detail
In addition, only one trail is available on Zeppelinstraße (B433) near the airport between Monday and Thursday from 9 a.m. to 4 p.m. in the direction of Schnelsen/Norderstedt/Langenhorn, since the siels are cleaned there. Furthermore, Andreas-Meyer-Straße in the southeast of the city will be completely closed on Friday. From Saturday evening to Tuesday morning, this important connection between the A1 and the Billbrook industrial area will not be passable.
The city of Hamburg offers an overview of current construction sites on federal remote and main roads on its website, which enables users to search for construction sites by zoom or address. Detailed information can be called up by clicking on the corresponding symbols. This information is available via the construction site card and a hotline that can be reached from Monday to Friday between 7 a.m. and 7 p.m. at (040) 42828-2020. As hamburg.de notes, construction sites usually have a duration of at least three days.
The future of mobility in Hamburg
In view of the ongoing construction sites and the challenges in urban traffic, Hamburg relies on digital solutions. The strategy for the further development of the Intelligent Transport Systems (ITS) aims to develop a new, digitized and networked urban mobility system. This was sealed by a declaration of intent from the Authority of Transport and Mobility Data (BVM) with the Federal Ministry of Digital and Transport (BMDV) in December 2022. Hamburg already presented solutions to the mobility of the future at the ITS World Congress 2021 and is planning further presentations for the UitP World Congress 2025 and 2027.
Digitization plays an important role in networking mobility offers and optimizing traffic management. The city has set up a concept for the further development of digital mobility that is assigned to nine development paths, including mobility twins, traffic management and digital subway and S-Bahn offers. In this way, safety for cyclists and pedestrians should also be improved. The subject area "Data Management" in Hamburg is currently systematically collecting and preparing, such as "https://www.hamburg.de/politik-und-verwaltungen/bvm/verkehrs-und-infrastructure data-191354"> Hamburg.de
Details | |
---|---|
Ort | Hamburg, Deutschland |
Quellen |