Complete closures in the Mansfeld-Südharz district: traffic chaos from October!
Traffic disruptions in the Mansfeld-Südharz district: full closures from October 13, 2025, plan diversions in good time.

Complete closures in the Mansfeld-Südharz district: traffic chaos from October!
There will be significant traffic restrictions in the Mansfeld-Südharz district in the coming weeks. From October 13th, the Street of Peace at the entrance to the town from the direction of Annarode in Siebigerode will be completely closed for probably two weeks. The reason for this is necessary renovation work on the roadway, gutter and culvert. Road users should prepare for diversions that lead via the B 86, the L 151 in the direction of Wimmelburg, the L 225 via Helbra and the L 160 and the B 180 to Mansfeld. The warning is valid until October 25, 2025, 8:00 p.m., as news.de reports.
It is advisable for drivers to plan alternative routes in good time and use navigation devices or map apps to find the best bypass routes. In particular, using the citizen information and warning app (BIWAPP) can help to receive regularly updated information about traffic conditions. This app is provided by municipalities in Germany as part of their disaster protection and enables quick warning messages to the population.
Additional closures in view
In addition to the closure of the Road of Peace, there are currently other construction sites in the district that require attention. On the B 180, from Walbeck to the B 180 Quenstedt – Sylda junction, the road will be rebuilt by December 31, 2025. The diversion leads via the L 85 and the L 72 to Sandersleben and in the opposite direction. In addition, the L 158 near Friedeburg, Gerbstedter Landstraße, is also completely closed until October 17th due to damage to the retaining wall. Table views and bypasses that lead via the L 158 and B 155 should be taken into account here.
- **K 2305, Breitenbach**: Vollsperrung von 04.08.2025 bis 31.10.2025 für den Bau eines Schmutz- und Regenwasserkanals.
- **K 2123, zwischen L 158 und Oeste**: Vollsperrung bis zum 15.05.2026 wegen Ersatzneubau einer Brücke.
- **L 227, zwischen Rödgen und Mansfeld**: Vollsperrung bis zum 30.10.2025 für Ersatzneubau eines Durchlasses.
The challenges and the need to maintain a reliable and safe transport infrastructure are also addressed by PTV Group. A well-planned transport infrastructure not only improves the efficiency of transport, but also contributes to reducing congestion and improving air quality. In times when more and more people are concentrated in urban areas, it is crucial to shape the transition to a sustainable and climate-friendly transport policy.
In summary, although the current renovation works and closures are inconvenient, they are necessary in the long term to ensure the safety and sustainability of our roads. Dealing correctly with these challenging times will be crucial in order to ensure the mobility of all citizens in the best possible way.