Bauchaos in Pirna: Lohmener Straße partially closed until August!
Bauchaos in Pirna: Lohmener Straße partially closed until August!
In Pirna-Copitz it will soon be round: From July 28th, extensive construction work will begin at the Lohmener Straße/Karl-Büttner-Straße intersection, which will last until August 8th. The reason for the measures is the renovation of the building at Karl-Büttner-Straße 5/5 a by the municipal housing company Pirna, such as Saechsische.de reported.
How is work? Specifically, the building is supplied with new connections for drinking water, waste water and electricity while the gas connection is separated. Karl-Büttner-Straße in the intersection is completely closed to the duration of the work. Lohmener Straße remains accessible on half -sided; A traffic light will regulate the flow of traffic. Residents have to reach their houses via a detour via Lugstrasse.
traffic management during the construction phase
In order to optimize the flow of traffic, Damaschkestrasse and Lessingstraße are declared one -way streets during the work. "The measures are urgently needed to beautify our city for residents and guests," explains the city administration and emphasizes the importance of information about current construction measures and their traffic restrictions. Because such restrictions not only arise at the construction period, but are often triggered by larger events such as Open-Air festivals, as can be read on pirna.de.
To make the citizens easier to plan route, a card with current closures and diversions is provided. In addition, important additional information about the duration of the construction sites and the associated traffic disruptions are available. This not only creates transparency, but also helps to keep the inconvenience as low as possible during the construction phase.
current traffic situation
With these measures in Pirna, not only the infrastructure is improved, but also a significant contribution to the attractiveness of the city. However, residents and travelers should carefully inform themselves about the upcoming changes in order to be able to navigate through the city.
Details | |
---|---|
Ort | Karl-Büttner-Straße 5, 01796 Pirna, Deutschland |
Quellen |
Kommentare (0)