Construction work on the S-Bahn: failures and replacement buses in Schöneweide!

Construction work on the S-Bahn: failures and replacement buses in Schöneweide!
In the coming weeks, the passengers of the S-Bahn Berlin will have to adjust to some changes in train traffic. From Friday, July 4th at 9:45 p.m. to Monday, July 7th at 1:30 a.m., considerable restrictions will occur due to construction work on five S-Bahn lines. The measures focus on the area of the S-Bahn station Schöneweide, where a new electronic signal box is installed. This includes the construction of foundations for signals, cable laying, track crossings and the installation of switch loops, such as berlin-live.de reported.
For the affected S-Bahn lines S45, S46, S8, S85 and S9, a complete interruption of train traffic between Schöneweide and Grünau and Grünbergallee is necessary. In order to offer passengers a way to achieve their goals, replacement traffic on buses has been set up. This is how a replacement bus line for the S46 between Schöneweide and Grünau runs. The buses at the Sterndamm stop (S-Bahnhof Schöneweide), Wagner-Régeny-Allee (Johannisthal), Rudower Chaussee (Adlershof) and Richterstraße (Grünau) hold. For the S9 there are also stops in Ewaldstrasse and Altglienicke.
Information on replacement traffic
The passengers are asked to find out about the routes in the S-Bahn app or through notices in advance, since there are no updated timetable information at the time of reporting. Tickets for the replacement buses must be bought before the start of the journey, since no driving tickets are sold on the buses, as can be read on SBahn.berlin. In addition to the restrictions mentioned above, further construction sites are known in the network of the Berlin S-Bahn. Among other things, there are also delays and changes between Warschauer Straße and Westkreuz, as well as in the section Teltow city to Lankwitz. And in other areas, especially between July 4 and July 7, there will be various restrictions that the passengers should take into account, as vbb.de.
The overview of all construction measures over the next 10 weeks is available on the website Radecken-info.de. There you will find all the important information about the period, the type of restrictions and many other details that are important for the use of traffic. These measures are part of the continuous efforts of the S-Bahn to modernize and improve the infrastructure, even if they may have some inconvenience for passengers at the moment.
Details | |
---|---|
Ort | Schöneweide, Deutschland |
Quellen |