Traffic chaos in the Dahme-Spreewald: Attention commuters!

Current traffic information for the Dahme-Spreewald and Oder-Spree district: rail failures, construction work and diversions until July 2025.
Current traffic information for the Dahme-Spreewald and Oder-Spree district: rail failures, construction work and diversions until July 2025. (Symbolbild/NAG)

Traffic chaos in the Dahme-Spreewald: Attention commuters!

The Dahme-Spreewald district is currently affected by a traffic chaos that pendants and travelers with great challenges. Several construction sites and technical breakdowns ensure considerable restrictions on road and rail traffic. Like maz-online.de reported, the effects are particularly serious.

The Situation in rail traffic is very bad: Between the Airport Ber and Wünsdorf-Waldstadt, the re8 occurs to failures until August 15; Here replacement buses take over the transport between Schönefeld and Zossen. The situation on the RE2 and RE7 becomes even more dramatic, where all -day failures are pending by June 22nd and buses also have to run as a replacement. From June 20 to July 5, all RB22 trains will fail between Potsdam Hauptbahnhof and Königs Wusterhausen, which Pendler is forced to refer to alternative connections.

traffic restrictions through construction sites

But that's not all: there are also numerous construction sites and closures in the street infrastructure. The databrief emphasizes that the S46 railway line in Berlin is only limited to a limited extent wrong. Night trains of the lines RE2 and RE7 fall out in the nights from April 24th to 27th and from May 22nd to 25th, which leads to further complications for commuters.

When we look at the street construction sites, the following restrictions await us: On the A117, the feeder Treptow towards A113 will probably be closed until the end of June, while the driveway from Hans-Grade-Allee in Schönefeld-Nord is not accessible until August. In the district itself, the district road between Grödtsch and Pretschen, the L401 in Eichwalde and the road section in Kablow brick factory until October.

commuter!

In view of this situation, it is advisable that commuters regularly check the timetable information in order to avoid unpleasant surprises. Because as we all know, it can quickly become a nightmare to cope with the rush hour together. The persistent work and traffic disruptions should not be underestimated and require good timing to get to the goal.

Finally, it can be said that the current traffic problems in the Dahme-Spreewald district are not only caused by construction sites, but also by technical difficulties. The Federal Ministry of Transport and Digital Infrastructure emphasizes in its standard work "Traffic in Numbers", which is a compendium on the traffic situation in Germany for over 50 years, the importance of the transport infrastructure and its continuous care. bmv.de notes that this remains of central importance for mobility in Germany.

commuter and travelers are well advised to keep an eye on the location and to find out about alternative ways and transport options in good time. With a little planning, you can perhaps avoid the traffic fog a few meters.

Details
OrtKönigs Wusterhausen, Deutschland
Quellen