Stau-alarm in Teltow-Fläming: traffic chaos on A10, A12 and A13!
Stau-alarm in Teltow-Fläming: traffic chaos on A10, A12 and A13!
This day, June 19, 2025, the current traffic situation in Teltow-Fläming ensures lively reporting. Many drivers are dependent on a little patience on the most important traffic arteries. According to a report from MAZ there are various traffic jams and delays on motorways as well as on federal roads, which in some cases extend over several kilometers.
If you look at the highways, the A10, A12, A13 and A113 are particularly affected by the congestion. The A10, the southern ring, reports stalling traffic between the Nuthetal triangle to the Spreeau triangle. There are also greater accidents on the A12, which provides delays up to the Fürstenwalde triangle. In addition, stau.info that on the A113, the motorway feeder to BER, must also be counted between Schönefeld and Neukölln.
Overview of current traffic jams and construction sites
The federal highways also make their contribution to the traffic situation. The B101 and the B96, which are close from the outskirts of Berlin to Jüterbog and Baruth, are particularly affected. Construction sites and traffic instructions on these routes are often the source of delays, whereby the attention on the streets is often required by drivers.
The traffic information is provided by TomTom, which use GPS data of millions of devices and mobile phone devices. This data is updated every five minutes and come from around 80 million mobile phone devices and official road sensors. This enables a highly topical image of the traffic situation in Teltow-Fläming.
dispute over traffic
daily traffic brings a wild mix of construction sites and accidents that challenge drivers. On the A100, the city ring of Berlin, there are also problems with several traffic jams this morning. Between the Schöneberg cross and Innbrucker Platz, it is important to drive carefully, because here there is always a storming traffic.
In addition, several construction sites can be observed on the A115. The right lane is blocked between the Nuthetal triangle and the radio tower - a hiking construction site that many drives to despair. Great consideration is expected to ensure the safety of everyone.
According to a comprehensive report of the Federal Ministry of Transport and Digital Infrastructure has been valuable data on traffic in Germany for over 50 years. The statistics include mobility behavior, accidents and emissions. This information can be used as a basis to optimize future traffic planning and to further develop both the infrastructure and mobility behavior.
summarized the commuters in Teltow-Fläming can be prepared for a challenging day. Whether on the highway or on the federal roads, you should always have a good hand to get to your destination safely. Therefore, it is only to be hoped that the traffic situation will soon relax and everyone will get to the destination.
Details | |
---|---|
Ort | Teltow-Fläming, Deutschland |
Quellen |
Kommentare (0)