Construction site chaos in Teltow: road users have to be patient!
Construction site chaos in Teltow: road users have to be patient!
Teltow, Deutschland - In Teltow, the construction work on the main traffic is in full swing, which leads to noticeable road closures. Five construction sites ensure diversions and extended travel times for drivers. The water and sewage association "Der Teltow" has been busy letting drinking water pipes in Lichterfelder Allee in Seehof since autumn 2024. The Warthestrasse, which leads towards Kleinmachnow, is also currently affected, which results in significant impairment for traffic. Drivers cannot turn from Potsdamer Straße to Warthestrasse, and the Kleinmachnower have no access to the shopping markets via the roundabout Oderstraße due to the closures.
The city of Teltow informs the citizens about the construction site and has announced that the work in Warthestrasse should be completed by June 13, 2025 at the latest. During this time, cars and buses have to be diverted. Lusters, on the other hand, drive via Potsdamer Straße onto the Oderstrasse. In addition, access from Neißen- to Warthestrasse is not possible.
extensive construction projects
In addition to the Warthestrasse, further construction projects are planned in Teltow. In the Lichterfelder Allee, where dirty water pipes have been renewed since 2024, the work will continue until July 2025. A new diversion is not set up here; The traffic is moved to the road towards the old town and Ruhlsdorfer Platz. In the summer of 2025, another construction site will be set up on Potsdamer Straße between Moldau and Elbestrasse. The roadway work is planned here, which result in a blocking of the lane. Drivers have to expect that they cannot turn from the Wartestraße roundabout to the shopping markets in Oderstrasse for about four weeks.
on Potsdamer Straße have been announced for July or August 2025, in which four centimeters of asphalt milled and replaced by a new lane ceiling. The traffic to Mahlower Straße is moved to the opposite lane during this time, and drivers who want to go to Stahnsdorf or Potsdam are diverted via Rheinstraße.
construction projects in the region
The construction project in Teltow is part of comprehensive measures throughout the region. In Kleinmachnow, for example, the waterworks on Rudolf-Breitscheid-Straße will be expanded by 2026. Furthermore, 2024 conversions take place on various wastewater pumping plants. In Stahnsdorf, several renovation work on drinking water pipes are also planned there, which were to start in 2024. These ongoing projects show the continuous efforts of the city and the corresponding associations to improve the infrastructure and ensure that water supply and disposal remains efficient.
For further information on the current status of the construction work in Teltow, you can do the articles on maz online , wazv der teltow and teltow-fläming read.
Details | |
---|---|
Ort | Teltow, Deutschland |
Quellen |
Kommentare (0)