New construction site card in the Ludwigslust-Parchim district: Information now online!
New construction site card in the Ludwigslust-Parchim district: Information now online!
In the district of Ludwigslust-Parchim There are news for all road users! The district has published a brand new construction site card on the Internet, which enables citizens: inside, to find out quickly and clearly about the current construction work on district and municipal roads. According to the NDR, the card shows all ongoing work, whereby full closures are shown by red, half -sided closures by yellow and other closures, such as on bridges, by gray signs. A practical click on the signs provides information on the duration and type of closure.
The development of this construction site card comes from the ranks of the citizens' service, the measurement and geographic information as well as the street and civil engineering of the district and was inspired by the country's existing construction site calendar. So far, only the ongoing construction projects have been shown, while planned construction sites are planned in a future expansion. No passage will be possible over the Rügen bridge in the coming weeks, and the maintenance work on the Peenbrücke will also continue. A total of 42 million euros are available for this year to ensure efficient road and civil engineering.
Current construction sites in view
But which streets are specifically affected? Several larger projects are listed on the construction site list of road MV that expect a dense volume of traffic. Among other things, the A11 between Penkun and Pomelle and the A14 between Plater Berg and Schwerin-Ost is on the list of road renovations. Various projects are also underway on the A19, including lane repairs and building work, which take place between June and July. In particular, the construction work on the A20 and the A24 are in the river, and for drivers: there can be increasing delays here.
- A11 Penkun - Pomelle: Lane repair, starting on June 13, 2025, length 8.9 km.
- A14 Plater Berg-Schwerin-Ost: Lane repair, also starting on June 13, 2025, length 1.0 km.
- A19 Zarnow - Rostock: Lane repair, January 29, 2025 to July 1, 2025, length 850 m.
- A20 Schönberg - Grevesmühlen: 500 m road repair, starting on June 13, 2025.
movements are also available in the organization of the construction sites. A central construction site and event management system (BEM) ensures better coordination and implementation of mobility management measures. This is intended to plan long -term construction measures and events more forward -looking. The BEM will ensure that the information flows in the event of faults in the traffic flow will become significantly faster, which is a relief for all road users.
These developments clearly show that the Ludwigslust-Parchim district is actively working on an improved infrastructure and also does not leave the citizens in this important topic. In order not to miss the current status of the construction work and its effects on traffic, a regular look at the Baustelle card essential. The comprehensive List of construction sites from Straße-MV keeps all affected routes and measures.
Carefully drive on the streets and always be prepared for possible changes in the traffic situation!
Details | |
---|---|
Ort | Landkreis Ludwigslust-Parchim, Deutschland |
Quellen |
Kommentare (0)