New tram network in Rothensee: More security and comfort for everyone!

New tram network in Rothensee: More security and comfort for everyone!

There are exciting news from the heart of Magdeburg! Magdeburger Verkehrsbetriebe GmbH & Co. KG (MVB) has now successfully completed the new construction of the tram line on line 10 in the Rothensee district after four years of construction. The new route, which extends over 1.4 kilometers, became necessary after the old tracks were badly damaged in 2013 by flooding. Now it is important to set the course for the future, with a clear focus on flood protection and durability of the infrastructure. For example, an open gravel bed was installed to ward off future flood damage, while stress-resistant track cover plates at crossing points provide additional protection for vehicle traffic.

The investment of this size is a proud 31 million euros, which are financed by federal funds from the special fund of "development aid". This not only improves the connection from Rothensee to the city center, but also increases the quality of life of the residents, as MVB emphasizes in its message.

a modern connection

A special highlight are the new, barrier -free pairs of stops that now enable the stepless access to the tram. Motor traces as well as foot and bike paths have also been created to increase mobility for all road users. With an underground management and supply system, which has also been renewed, the new route is well equipped for the coming years. By autumn 2025, all construction work should now be completed, which means a great improvement for both public transport and residents.

parallel to this project, the conversion of the intersection Ebendorfer Chaussee / Milchweg starts on March 4, which is intended to ensure further progress for the Magdeburg tram. The goal is to build a new tram route in the Neustädter Feld, which will link the area with existing routes towards Kannensieg and Ikea. For this, a track cross was completely renewed, and the drinking water and electrical cables are also updated regularly.

variety of measures

The construction period for this important project is 14 months, and road users have to adapt to some restrictions. From March 4, the Ebendorfer Chaussee will only be accessible in the direction of Ikea. Depending on alternative routes are already planned and drivers are asked to pay attention to the new traffic tours.

With these extensive work, the city takes an important step in the direction of the mobility turn, which aims to promote new mobility concepts and alternative means of transport. According to the Federal Ministry of Digital and Transport, cities are the main players of this turn that aims to reduce motorized private transport and to inspire people for foot traffic, bicycle and public transport. A well thought -out infrastructure “the short distances” plays a crucial role.

We can look forward to an exciting time in Magdeburg, in which not only the tram lines are modernized, but also a comprehensive concept for environmentally friendly and sustainable mobility. The continuous improvement of the traffic landscape will be important for both the citizens and the economy.

For more information about the traffic renovation and future projects, visit the official pages of the Magdeburg transport company href = "https://www.mvbnet.de/2-nord-sued-berbind-fuer-die-strassenbahn-kreuzungs-an-der-ebendorfer-chaSee-startet/"> Neue tram street and the initiatives for the Mobility change .

Details
OrtRothensee, Magdeburg, Deutschland
Quellen

Kommentare (0)