Refurbishment Berlin-Hamburg: 13 train stations become modern oases of the future!
Refurbishment Berlin-Hamburg: 13 train stations become modern oases of the future!
From August 2025, “construction work ahead” is called on the route between Berlin and Hamburg. The section is blocked for several months and travelers have to adjust to longer travel times. During this time, around 13 train stations in Brandenburg are on the renovation list of the Deutsche Bahn, which wants to significantly improve waiting times and travel quality. The focus is on transforming this stations into modern future stations that meet the needs of today's travelers.
A total of eleven stations in Brandenburg are affected, which are to be redesigned according to the latest standards. These include train stations such as Seegefeld, Falkensee, Finkenkrug and Brieselang, to name just a few. All stations not only receive a new coat of paint, but also numerous improvements that make travel more comfortable overall. Deutsche Bahn thus pursues the goal of creating uniform quality standards for travelers. As reported Bahnblogstelle.com, increased weather protection, new waiting rooms and a higher accessibility are integrated into the future stations.
modern train stations for more comfort
Project manager Adrian Bernhardt of DB Infrago is convinced that the nine -month route closure offers an excellent opportunity to modernize the train stations comprehensively. Among other things, the redesign includes sustainable lighting and improved storage facilities for bicycles, which should make rail travel more attractive. The new design of the train stations should not only be functional, but also reflect the regional identity. If you sense the awareness that each train station has its own flair!
In addition to the stations already mentioned, the train station in Berlin-Albrechtshof is also being rebuilt. Last but not least, the conversions of Bad Wilsnack and Glöwen are still under test, so that a little future potential may also develop here. These melt river banks with railway culture into a harmonious unit.
challenges during the construction period
But the renovation not only has advantages. The travelers must expect significant diversions and longer travel times during the construction period. Long -distance trains are diverted via Stendal, Uelzen and Salzwedel, which adds an additional 45 minutes to travel time. There are also adjustments in local transport, with some regional lines to ensure faster connections to Berlin and Hamburg. The removal holds are replaced by buses, but this can also be associated with longer travel times.
The general renovation also includes the renewal of over 180 kilometers of tracks and 200 course as well as the creation of six additional transfer positions to increase operational stability and flexibility. The basis for all of these measures forms the amended Federal Railway Expansion Act, which paves the way for this necessary infrastructure change, how deutschebahn.com emphasized
A challenge that should not be underestimated, because many of the train stations were underfunded for years and in poor condition. The target picture "Future Bahnhof" should therefore ensure that train stations will be designed holistically in the future in order to meet the over 20 million daily guests, as dbinfra.go. With sufficient investments and a clear plan, traveling on the trains between Berlin and Hamburg could soon be redefined.
Details | |
---|---|
Ort | Ostprignitz-Ruppin, Deutschland |
Quellen |
Kommentare (0)