Cash and construction sites: Current traffic disruptions in Rostock!

Cash and construction sites: Current traffic disruptions in Rostock!

Rostock, Deutschland - Rostock is currently faced with a variety of construction sites that strongly influence traffic in the city. The current work is not only necessary to improve the infrastructure, but also have some restrictions for drivers and pedestrians. The Nordkurier since July 10th until September 19th for construction work is closed. This is just one of many construction sites that currently shape the cityscape.

Another big project takes place on Heinrich-Heine-Strasse, where the district heating network is expanded. Full closure will come in sections, especially between Schulstraße and Kirchenplatz. Depirtions are set up so that the entrance to the middle ground from the east is not possible. Alternatively, a route is recommended via Anastasiastraße.

Current construction sites at a glance

  • Wiener Platz: closure until September 19 because of district heating management.
  • Heinrich-Heine-Straße: full closure between Schulstraße and Kirchenplatz.
  • Peter-Cornelius-Straße: Construction work on water pipe from July 14th to 19th with half-sided closure.
  • Hundsburgallee: closure until July 23 to renew the bus set -up areas.
  • Ulrich-von-Hutten-Straße: disabilities until July 26th.
  • Weidendamm: closure by early 2026 for redesign.
  • Kunkeldanweg: full closure from July 14th to 19th
  • Kärntner Straße: full closure from July 14th to 18th due to asphalt covering.
  • Salzburger Straße: traffic room restrictions from July 15th to 19th
  • Kempowski bank: Limited use for kaianan system renovation.

In addition, the work on the south side of the railway bridge is pushed forward. The passability of the tram systems has already been restored here and the acceptance process was prepared. According to rostock-heute.de this is part of a comprehensive construction program that includes a number of new road construction projects for 2025.

Especially after the construction of the new district heating line in the connecting path between Rövershäger Chaussee and Tessiner Straße, which begins on February 24, 2025, some traffic restrictions can be expected. These measures should improve the quality of life in Rostock sustainably, even if there can be disabilities.

traffic safety in focus

The security situation is also not neglected. As can be read on traffic situation.de , there are numerous dangers such as risk of slipping or obstacles on the road during construction times, which are a potential risk for road users. Therefore, special caution is required.

So, dear Rostocker and visitors to this beautiful city, carefully plan your routes around these diversions and construction sites. It can require a little patience, but in the end all of these measures serve the goal of making Rostock even more livable.

Details
OrtRostock, Deutschland
Quellen

Kommentare (0)