Traffic chaos in Schwerin: construction sites and beach festival cause disorders!

Traffic chaos in Schwerin: construction sites and beach festival cause disorders!

road users in Schwerin should adapt to some changes, because in the coming days there are both construction work and an event. These activities have a noticeable effect on the flow of traffic and could lead to delays. A special occasion that attracts many visitors is the Stadtwerke beach festival, which on 12. and July 13, 2025 and different streets are blocked in the context.

During the beach festival, the Bosselmannstrasse and the old village street are completely closed from the access to the Viippendorf car park. The closure applies on Saturday from 10 a.m. to midnight and on Sunday from 10 a.m. to 5 p.m. . The gratifying detail: The right lane of the street on the Crivitzer Chaussee, between Plater Strasse and on the Green Valley, is opened for parking purposes during this time. This could be a welcome relief for visitors who want to travel by car to enjoy the festival.

construction work and renovations throw their shadows ahead

After the holiday weekend, on 14. July 2025 The renovation of the sidewalk on the obotrite ring, in the intersection to Wittenburger Straße. Unfortunately, only one lane is available to around 30 meters in the city, which can lead to traffic disruptions. The work is expected to go to 22. August 2025 scheduled and promote the need to make traffic in the urban area sustainable. Such measures are part of a larger plan to promote the mobility turn.

At the same time, Lübecker Straße will also be brought up to scratch from July 14th. Here the sidewalk surfaces between house numbers 108 to 132 and the area from the space of freedom to the obotrite ring are renovated. Pedestrians have to be prepared for diversions, because the detours are led to the opposite side of the street. Parking bans in the construction site area are also to be expected, which the residents have already informed.

other construction projects are on

Additional repair work from 16. until July 18 on the program on the Ludwigsluster Chaussee. Here the walking and bike path between the Straße Krösnitz and the street Ostorfer bank is repaired. During this time the path is completely blocked. The detour takes place via the street "On the Dwang". The SDS own company asks the citizens for understanding and recommends that the listed restrictions to be included in their plans.

In order to meet all of these challenges, it is not only important to keep an eye on the current construction sites, but also to consider the long -term developments in the city. Services that are promoted, for example, as part of the Innovation Initiative Mfund of the Federal Ministry of Digital and Transport, support municipalities in the development of sustainable traffic solutions. It depends on integrating different means of transport and pursuing new mobility concepts. After all, the goal is to strengthen mobility as a decisive factor for economy and society and at the same time to improve the local infrastructure.

Overall, it remains to be seen how the next few days will affect the traffic situation in Schwerin. However, informed citizens are better prepared for the changes and can find a stress-free path to the Stadtwerke beach festival or to the shopping miles.

For more information about the construction projects and traffic reports in Schwerin, follow the links: Nordkurier , Schwerin.de , and BMV .

Details
OrtSchwerin, Deutschland
Quellen

Kommentare (0)