Outdoor swimming pool: Start of the season without a lack of staff!
Outdoor swimming pool: Start of the season without a lack of staff!
The outdoor pool season has a promising start in Ludwigshafen. The outdoor pool at the Willersinnweiher opens its gates on Wednesday, and the preparations for this have already been completed. At the official opening, the head of the outdoor pool, Gabriele Müller, will emphasize how important the satisfaction of the bathers is for the team. This is particularly relevant after the lack of personnel has been a challenge for the company in recent years. Fortunately, this is no longer an issue, reports Rheinpfalz .
The challenges in outdoor pool operations are diverse. In an interview with Christiane Vopat, Gabriele Müller spoke about her experiences and the need to create structured processes to ensure smooth operation. Personnel use is a central topic that affects not only the safety of the bathers, but also the profitability of the company. In its analysis, the DGFDB emphasizes that bathroom operators have to use suitable employees for different tasks such as operating supervision and water supervision. The staff also represents a significant cost factor, which is why an efficient organization is urgently necessary, as is from DGFDB .
preparations and challenges
The past few years have not always been easy for the will-dollar outdoor pool. The need to find and train staff was as challenging as the securing of a high safety standard for the bathers. With the aim of mastering these challenges, the leadership of the outdoor pool has now made great progress. Gabriele Müller is optimistic about the coming months and the opportunity to offer the outdoor pool visitors a relaxing time.
To ensure that the company runs smoothly, swimming pools must regularly provide further training offers that are determined by the DGFDB training and further training. These range from day events to multi-day seminars to in-house training. Despite the existing shortage of skilled workers, the qualification of the staff remains an important topic in the industry.
outlook for the season
Overall, the season preparation in the will-blind swimming pool is going very well. The positive development in the personnel area gives those responsible the confidence that the coming months can be successfully designed. Visitors can look forward to experiencing the facilities in new splendor. The outdoor pool promises not only a place to cool down, but also to be a space for leisure and relaxation in the city. All information about the opening and the offers can be found at Mannheimer Tomorrow .
Details | |
---|---|
Ort | Ludwigshafen, Deutschland |
Quellen |
Kommentare (0)