Full closure on L205: Refurbishment ensures traffic chaos in the Burgenland district!

Vollsperrungen im Burgenlandkreis: Sanierungsarbeiten an Landesstraßen bis 2026, Investitionen von 6,8 Mio. Euro angekündigt.
Full closures in the Burgenlandkreis: Refurbishment work on state roads until 2026, investments of EUR 6.8 million announced. (Symbolbild/NAG)

Full closure on L205: Refurbishment ensures traffic chaos in the Burgenland district!

The state road 205 between Markröhlitz and the Eulau junction has been fully closed since last Friday due to extensive renovation work. As mz.de , the outdated route is extensively expanded over a length of 3.4 kilometers.

The measures not only include the removal of damage to the road, but also its widening and leveling. The planned laying of a new cycle path that will extend over a kilometer is particularly gratifying - from the Eulau junction to the Goseck junction. The work is expected to continue until the end of June 2026, while the country is investing around 6.8 million euros in the project.

further road closures in the Burgenlandkreis

But the full closure of state road 205 is not the only restriction in the Burgenland district. The state road L 203, the Lengefeld passage, is now affected in the amount of number 37. In addition, various further closures will take place from July 14, 2025, including the municipal "workshop" between the Sportplatz Deuben and the junction "Street Zur Voß", which is expected to go to ...

  • In addition, the local connection between Löbitz and Droitzen will probably be fully blocked from 14 to July 15, 2025.
  • The connecting road between Großgörschen and Werben will not be accessible from July 21 to 25, 2025 due to repair work.
  • The state road L 212 in Großwangen will also be blocked from July 21, 2025 until a time to be determined.

A comprehensive overview of all current road closures in the Burgenland district is on the administration website at burgenlandkreis.de to be found.

investments in the transport infrastructure

The current construction measures are in the context of a larger trend: Federal Transport Minister Patrick Schnieder recently announced the provision of 166 billion euros for traffic investments in this legislative period, which means an increase of over 60 percent compared to the five years before. bmv.de emphasizes that a large part of this sum flows into the rail and the federal roads.

The focus is primarily on the renovation and maintenance of the existing infrastructure. This shows how important the state appreciates the improvement in traffic conditions. In addition to the ongoing road construction projects, new buildings of roads and rail paths are also being sought.

Such investments are not only important for the transport infrastructure, but also for the traffic safety of the citizens, as well as the general mobility in the region.

Details
OrtMarkröhlitz, Deutschland
Quellen