Significant traffic restrictions in Werder: Construction work begin soon!

Significant traffic restrictions in Werder: Construction work begin soon!

From July 24, 2025,

in Werder (Havel) there will be large construction work that will significantly influence the traffic situation. This work, which lasts by September 19, 2025, aims to relieve the intersection of Landesstraße 90 (L90) and the Kessel Grundstrasse by building a mini -travel traffic. The ceiling renewal on the L90 between the oval creep on the old Kasernenstrasse and the level crossing also ensures an improvement in traffic safety. As cityreport.pnr24-online.de are reported.

The area of the Kesselgrundstraße and Phöbener Straße (L90) intersection is particularly affected, which is completely blocked. This means for residents and road users: detours are necessary! Car traffic is diverted towards the level crossing and junction Phöben via the Kemnitzer Chaussee, thick oak, Fuchsberg and the L90. Trucks have to dodge extensively on the highway and the Phöben junctions and Groß Kreutz. Anyone who lives in the L90 between the level crossing and the Kesselgrundstrasse can use the Birkengrundweg for access.

detours and restrictions

particularly important to know: Werder station (Havel) remains available via Eisenbahnstrasse and Adolf-Damaschke-Straße, but passengers must expect limited parking on the north side of the train station (Am Zernsee). In addition, there will be massive restrictions on bus traffic to which RegioBus will point out in the coming week. This may ensure longer waiting times and detours, which will certainly not only affect the residents but also commuters, as well as Zeit.de The first construction phase, which includes a new walkway on Kemnitzer Chaussee between Rosenstraße and Dahlienstraße from July 14th to 23rd

In addition, the renovation of the drinking water network in the area of the plantation square is currently underway, which is expected to be continued until October 26th. The work in the area of Eisenbahnstrasse between Bernhard-Kellermann-Straße and Kemnitzer Straße means that Eisenbahnstraße is being reversed to the one-way street towards the train station. The traffic from Phöben is also diverted via Kesselgrundstraße and Kemnitzer Chaussee. These construction sites also offer an insight into the complex world of civil engineering, where various perspectives cross, from politics to engineers to affected residents, such as "https://werder-life.de/aktuelle-bauste-in-werder/"> Werder-Life.de

The conversion of the critical traffic node on the L90 is all about improving traffic safety and reducing accident dangers. These measures are a necessity to meet the steadily growing demands on our infrastructure and to enable citizens to drive safely and comfortably. Even if the start of these construction work is often accompanied by some unrest and uncertainty, the long -term goal is clear: a better functioning traffic infrastructure for Werder and its citizens.

Details
OrtWerder (Havel), Deutschland
Quellen

Kommentare (0)