Commuters beware: massive traffic restrictions until December 2025!
Current information on rail and road traffic in the Dahme-Spreewald district on August 14, 2025: Restrictions and diversions.

Commuters beware: massive traffic restrictions until December 2025!
On August 14, 2025, the waves will hit regional rail traffic and commuters should prepare for some restrictions. Loud maz-online.de There are significant diversions and cancellations on several railway lines that will last into December.
The regional express RE2 and RE7 are faced with diversions between Königs Wusterhausen and Cottbus main station, and several stops in Raddusch, Vetschau, Kunersdorf and Kolkwitz are also canceled. In addition, there are numerous cancellations of individual RE7 trains between Königs Wusterhausen and Senftenberg, which are being replaced by buses. There are also cancellations between Potsdam Medienstadt Babelsberg and Borkheide until August 22nd, which also calls in buses to replace them.
Further rail restrictions
The regional train lines are also struggling with restrictions. The RB22 trains will be canceled between Saarmund and Königs Wusterhausen until August 18th. Trains will also be replaced between Ludwigsfelde-Struveshof and Königs Wusterhausen from August 18th to 22nd. In addition, the RB23, RB24 and RB32 are affected by various failures, and the RB36 will have to be interrupted from 10:30 p.m. between Beeskow and Königs Wusterhausen until October 14th. Commuters must expect significant travel time extensions during this period.
Loud traintoday.com There are also staff-related train cancellations, which mainly affect the DB Regio Baden-Württemberg. The cancellations between Miltenberg and Seckach also include replacement traffic that will be carried out between January 29th and January 31st, 2025.
Current road construction sites
But traffic restrictions are to be expected not only on the trains, but also on the streets. The A113 in Schönefeld-Nord is particularly affected, where the access from Hans-Grade-Allee towards Berlin-Zentrum will remain closed until the end of the month. The L39/Kolberger Dorfstrasse is also completely closed between Platz der Unity and the town exit of Prieros until summer 2026. Traffic is being diverted via the B246.
Traffic on Luckenwalder Straße in Königs Wusterhausen will be closed from August 18th to September 5th due to the replacement of a district heating pipe. The sewage pressure pipe on the school route will also be blocked until September 19th, resulting in a complete closure. In Erkner, in the neighboring Oder-Spree district, Friedrichstrasse will remain closed until October, which will affect the connection to the A10 to Eichwalde.
Constantly updated information
To make planning easier for commuters, the information in this article is updated weekly. For further details and current traffic information German railway an interactive disruption map and the option for push notification of delays in the offer. Commuters should therefore regularly inform themselves about the current status of their connections.
Whether on the train or on the street – it will remain exciting. We wish everyone a safe journey home and hope that the construction sites will soon be a thing of the past!