Traffic chaos in Rostock: traffic jams and construction sites paralyze the city!
Traffic chaos in Rostock: traffic jams and construction sites paralyze the city!
After a plump weekend full of movement, on June 30, 2025, one focus is above all in the focus of road users in Rostock: the numerous traffic jams and traffic information. Both motorway drivers and residents of the city are listed very closely, because the streets are partly firmly under control of construction sites and traffic disruptions.
The [Ostsee-Zeitung] (https://www.ostsee-zeitung.de/lokales/rostock/rostock-bad-doberan-und-guestrow-sta U-reporting-fuer-A19-A20-B103-B105-30-2025-GRHFRNVXYNEQBIEQHGBJOP7Y.HTML? Outputtype = valid_amp) lists current traffic jam information that extends over the A19 and A20 motorways as well as the federal roads B103, B105 and B110. The Neubrandenburger Straße in Rostock will be renovated in three sections from 2025, with the first part, which ranges from the level crossing to the Molkerei/Röthsoll residential area, probably starting in February 2025. Drivers must expect restrictions here about nine months, as in the adjacent residential areas, where the municipal utilities are planning a district heating supply that could also lead to months of closure.
traffic jam updates and current reports
On the current state of the traffic situation on the most important main traffic streets, various platforms report. A comprehensive live card is provided on the Stumelter-Map. The card shows:
- green = free journey
- orange = dense traffic
- red = traffic jam
- dark red = traffic jam
- black = lock
Current traffic jams were found on the B105. There are several reports here:
- between yellowish and bentwisch: 14 minutes of time loss, 3.6 km long.
- between Joachim-Schlue-Straße and Parkstraße: 5 minutes of time loss, 0.2 km long.
- In addition, several smaller disabilities and closures are reported, some of which only cause short time losses.
construction sites and permanent construction sites
Rostock continues to fight with construction sites pulled in length. The bridge in the racetrack at the zoo will be rebuilt by autumn 2026, while the Western Pomerania bridge over the Warnow has to be torn down and replaced. Here the time frame for these measures is scheduled for about 15 years!
Another provider of traffic information, Stau.info, complements the situation with a wide range of current traffic reports on federal roads and highways. Both construction sites and traffic jams are recorded that are important for drivers in the region every day.
Overall, drivers currently have to pay patience and expect delays. Wherever the trip leads, it remains necessary to regularly take a look at the traffic information - so you not only protect the nerves, but also the planning of the day.
Details | |
---|---|
Ort | Rostock, Deutschland |
Quellen |
Kommentare (0)