Chaos in road traffic: massive construction sites in Chemnitz from Monday!

Chaos in road traffic: massive construction sites in Chemnitz from Monday!
in Chemnitz there is a big one on Monday: new construction projects start on time at the beginning of the holiday that will lead to some changes in road traffic. The announced construction sites not only promise new challenges for drivers, but also a certain degree of patience, such as Blick.de
A particularly hot iron is Annaberger Straße, where a monitoring system is installed for the building test. Here, traffic remains single in both directions by Friday. For the daily commuting and residents, this means a reduced flow speed, which may sweeten the afternoon, but can also cost additional nerves.
full closures and half closures
at the intersection of Augsburger Straße and Bernsdorfer Straße, Augsburger Straße is fully closed. On the other hand, on the Bernsdorfer Straße it remains accessible on half -sided, regulated by a traffic light. The reason for these measures is the urgently needed work to renew the main line of drinking water. This construction site will certainly provide some discussions among the residents. tag24.de emphasizes that the constant changes in traffic and diversions often cause resentment among the chemnitzers.
Furthermore, two new construction phases are planned on Bernsdorfer Straße. There is a semi -sided range of roads on Pappelstraße in the city, and it is no longer possible to turn right into Pappelstrasse. Another section at Augsburger Straße is also closed on half -sided by October 2, also with traffic light control. That doesn't sound like a sugar slick for road users and cyclists.
other construction sites at a glance
The Carl-von-Ossietzky-Straße does not get away with it. From July 4th, between Gutenbergstraße and Senefelder Straße will be completely closed. Alternative routes are led via Zschopauer Straße and Clausstraße. In the main street in Euba, residents await a full closure between house numbers 13 and 18a from June 30th to renew through Eubaer Bach.
In addition, road traffic on Palmstrasse will be restricted by a one -way regulation in a landing direction between Dresdner Straße and Hainstraße from Monday. The reason? Road maintenance work to remove accident dangers. Stelzendorfer Straße is also fully blocked between house number 192 and 226 in order to lay lines. The diversions are signposted accordingly, as n-ag.net emphasized.
With these measures, a certain traffic chaos in the city will not fail to fail, especially at peak times. Residents and road users should therefore always keep an eye on changing diversions and closures. Patience is required - and maybe a good podcast for the car ride!
Details | |
---|---|
Ort | Chemnitz, Deutschland |
Quellen |