Schmalkalden-Meiningen: 1.5 million euros for schools during the summer vacation!
Schmalkalden-Meiningen: 1.5 million euros for schools during the summer vacation!
In the Schmalkalden-Meiningen district, a lot has happened during the summer vacation. The district invests vigorously in schools and ensures that the students and teachers can learn in better -designed rooms in the new school year. Around 1.5 million euros flow into various projects that are firmly planned with a total budget of 8.4 million euros in the financial year. These investments include both renovations and energetic improvements. Particular attention is paid to the primary school "Ludwig Chronegk" in Meiningen, where a new school garden facility is planned. Insuedthueringen reports that…
The school garden is equipped with six raised beds that house not only vegetables, but also garden and medicinal herbs. For this purpose, a water cistern is installed that stores the precious rainwater - a nice step towards sustainability! The lounge area is also upgraded: a newly planned pavilion with a table and bank group invites the students to learn outside when the weather is suitable. And for the break breaks, the free play area with new asphalt paintings and new play equipment is upgraded to offer the children more freedom of movement and play opportunities.
Diverse measures for better learning conditions
The investments include numerous projects in various educational institutions. In the primary and regular school flea, the corridors are renovated, for example, while the roof renovation is due in the Schmalkalden regional funding center. The Meiningen Adult Education Center also benefits from the changeover to district heating in order to reduce operating costs. The entire list of measures carried out shows how important the district takes the future of its schools and the children learning in it. Here are some highlights of the construction projects:
- elementary and regular school fled: renovation of the corridors, costs: approx. 100,000 euros.
- regional support center Schmalkalden: roof renovation, costs: approx. 250,000 euros.
- sports hall Forstgasse: conversion to decentralized instantaneous water heater, costs: 5,000 euros.
- Henfling-Gymnasium: sanitary facilities and barrier-free toilet are renovated, costs: approx. 200,000 euros.
These construction measures are not only necessary to maintain school operations, but also to meet the increased requirements for educational institutions. According to a current study by the PWC, the renovation and new building needs in German schools are becoming increasingly urgent, since many buildings no longer meet today's standards. It is estimated that the net initial returns for high -quality school properties are between 4.5 and 5.5 percent nationwide. Due to this development, more and more municipalities are looking for private sector partners to be able to put investments, since the financial resources are often not sufficient to carry out all the necessary measures independently. PwC emphasizes that ...
The projects in the Schmalkalden-Meiningen district should be completed by the end of the summer vacation and are based on the goal of enabling the pupils to start a smooth start into the new school year. It is a gratifying signal that the educational infrastructure is designed so active and future -oriented - and the small, curious heads will stimulate discovering and learning.
Details | |
---|---|
Ort | Meiningen, Deutschland |
Quellen |
Kommentare (0)