High voltage on construction sites: Schools in the Wartburg district are made fit!
High voltage on construction sites: Schools in the Wartburg district are made fit!
In the Wartburg district there is a lot to do during the summer vacation! The current construction and renovation measures at schools and educational institutions are in full swing. A total of ten schools are affected, which are to receive a fresh coat of paint by investing around 3 million euros. According to Insuedthueringen.de clarifies that these measures) the lesson -free time are carried out so as not to affect the lessons. After all, the students deserved to work in an appealing and modern learning environment during the holidays.
Different projects and completions
A prominent example of the construction project is the replacement new building of the Ruhla high school, the completion of which is imminent. This goes hand in hand with costs of around 3.5 million euros and includes the assembly of stair railings and painting work. Despite smaller delays due to delivery difficulties and a reduced personnel deployment, the handover is firmly planned for the new school year, as
Previous successes and planning
The construction work does not only affect large projects. Refurbishment measures at break stations and playgrounds at various primary schools, including the primary school Vacha and the Bad Salzungen Wuckeschule, are also on the agenda. There is a lot of hustle and bustle to further improve the conditions in schools. In particular, the regular school "Altensteiner Oberland" benefited from a new dining room. Preparations for the construction of the small sports facility at the Wutha-Farnroda primary school are already underway and are also to begin in August. Refurbishment measures are also available at the Gerstungen high school, where the teacher toilets will soon be renovated.
Special features of the school building projects
These initiatives in the Wartburg district reflect a larger trend, as can also be observed in Berlin, for example, where, due to the continuing population growth, numerous school construction projects are being planned. In Berlin, the Senate launched a so -called "school building offensive" in order to expand existing schools quickly and sustainably and create new school places. There are currently ten school construction projects in full swing, which range from the basic redesign to the expansion, such as Developmentstadt.de
With all these measures in the Wartburg district, a further step into the future will be taken. Under the direction of District Administrator Reinhard Krebs, the current and planned construction work are crucial in order to reduce the investment backlog in the school area. In this way, there is a confidence in a positive development of the educational landscape in the Wartburg district, which also benefits the students and teachers.
Details | |
---|---|
Ort | Wartburgkreis, Deutschland |
Quellen |
Kommentare (0)